Case study · Infrastructure · Services
Data centre, networking, wireless and voice for Sahara Next
Innovative solutions that boosted Sahara Next
Go up the towerExecutive summary
The challenge
The task was to design, supply, install, test and commission a unified network infrastructure: a structured cabling system able to support all telecommunication applications.
What we did
Our principal objective was to reduce the risk for Sahara India in designing and building the floors facility, while offering a communication network infrastructure that meets future application needs, through a state-of-the-art data centre and networking, wireless and voice solutions.
The result
Insight systematically solved all the major problems of the project in order of priority.
01 · Across India
About Sahara Next
Sahara Next is an offshore development and information technology outsourcing company that provides services and solutions to enterprises worldwide. Part of a $50 billion group (Sahara India Pariwar), it manages one of the largest IT and telecom infrastructures in India.
02 · Twenty floors
The building
The building has 20 floors. Sahara India Pariwar’s facilities are mainly on the ground, 2nd, 11th, 12th and 14th to 19th floors, with the main communication closet (server room) on the 16th floor. Each floor has its own communication closet (tech room) delivering network connectivity to all workstations, cubicles, cabins, and meeting and conference rooms, and 90% wireless signal strength to all floors. Access control and IP surveillance were installed in the common areas of every floor with 100% coverage, with a local CMS (command and monitoring system) at each floor’s security and a master CMS room in the basement.
03 · The brief
The challenge
The task was to design, supply, install, test and commission a unified network infrastructure, with a secured, unified security solution within the facility:
- a structured cabling system able to support all telecommunication applications (voice, data, building control systems, security, alarms and more)
- unified communication
- self-defending, scalable, agile and redundant switching
- seamless wireless, with mobility for all BYOD
- voice, data and video infrastructure
04 · System by system
The solution
Our principal objective was to reduce the risk for Sahara India in designing and building the floors facility, while offering a communication network infrastructure that can meet future application needs.
State-of-the-art data centre
We supplied, designed and integrated the fire alarm system, rodent system, water leakage detection system and cooling system, and delivered:
- Rack-to-rack UTP cabling.
- Multimode fibre from the 16th floor to every floor.
- Access control to the data centre on site.
- A cold and hot containment system.
Networking solution
We supplied and deployed 70 Extreme X460-24t, X450-48p, X450-24p, X440-48p and X440-24p switches, and:
- Configured L2 and L3 VLANs for every floor, with routing through the core L3 switch.
- Configured access control lists to prevent routing between VLANs.
- Configured quality of service for data, video and voice traffic.
- Implemented ELRP (Extreme Loop Recovery Protocol) for layer 2 loop recovery.
- Implemented MLAG for redundancy.
- Implemented OSPF with MPLS for the Lucknow connectivity.
Wireless solution
We supplied and deployed 150 Extreme AP4511 wireless access points and a WM3600 controller, and:
- Configured the wireless controller to manage all access points and wireless clients.
- Implemented multiple SSIDs with 802.11n for every branch office.
- Implemented LDAP integration for guest users, and 802.1X authentication.
- Configured wireless IPS and wireless firewall for rogue AP detection and unauthorised client detection.
- Configured Smart RF for seamless roaming.
Voice solution
- Implemented end-to-end IP telephony with Cisco voice technology.
- Configured 500+ Cisco CP-3905 IP phones, 800+ CP-6921 IP phones, Cisco Wi-Fi IP phones, a Cisco 2951 voice gateway router and two CUCM voice servers.
- Configured a cluster between the two CUCM servers.
- Configured internal call partitions, calling search spaces, logical partitions, translation patterns and routing patterns for STD and ISD calls.
- Configured the voice gateway with two PRIs for redundancy.
- Configured a trunk between the Mumbai CUCM and the Lucknow EPABX.
05 · In order of priority
The result
Insight systematically solved all the major problems of the project in order of priority.
As a member of The Green Grid, a global consortium dedicated to advancing energy efficiency in data centres and business computing ecosystems, Insight has taken the initiative to significantly reduce its carbon footprint while designing its premier network infrastructure solutions.