TAPP-3&4 is 200 km from Mumbai, on a campus more than 2 km in radius whose civil infrastructure was built in phases. The challenge was to keep the campus in line with the latest civil infrastructure, IT investment and deployment.
What we did
Insight was approached to design the solution and deliver the whole project on a turnkey basis, deploying the latest server, backup and connectivity solutions.
The result
Insight systematically solved all the major problems of the project in order of priority.
01 · Two units
About Tarapur Atomic Power Project
The 540 MWe TAPP-3, a totally indigenous nuclear power unit, is the 16th nuclear power reactor in the country. It was designed and built by the Nuclear Power Corporation of India Limited (NPCIL), a public sector undertaking under the Department of Atomic Energy (DAE). Unit 3 of the Tarapur Atomic Power Project attained its first criticality on 21 May 2006, about two months ahead of schedule: a major milestone that signified the start of a self-sustaining nuclear fission chain reaction in the reactor core. Unit 4, which preceded Unit 3, achieved criticality on 6 March 2005. TAPP-3&4 comprise two Pressurised Heavy Water Reactor units (PHWRs) of 540 MWe each, which use natural uranium as fuel and heavy water as moderator and coolant. TAPP-3&4 were built in a shorter time than any other PHWRs in India, a gestation period comparable to international benchmarks.
02 · Far from everywhere
The challenge
TAPP-3&4 is 200 km from Mumbai. The campus is more than 2 km in radius, and its civil infrastructure was built in phases. The challenge was to keep the campus in line with the latest civil infrastructure, IT investment and deployment.
03 · Round the clock
The solution
The customer approached Insight to design the solution and deliver the whole project on a turnkey basis. These are the key infrastructure solutions deployed, in line with the latest technology:
- Server solution. Because the project ran in phases, the IT requirement was very dynamic and not well defined, and with the project working three shifts, manageability was a key deciding factor. We positioned Intel Xeon-based Compaq/HP ProLiant servers, giving an expandable, highly available and scalable solution that is easy to manage.
- Backup solution. At a remote location, data management was the top priority. The solution had to be easy to manage and deploy, and support heterogeneous platforms and applications on HP UNIX, Novell and Microsoft. We supplied and integrated an HP autoloader with the BakBone NetVault backup solution, giving flexibility across operating systems and databases.
- Connectivity solution. The plant is 200 km from Mumbai and the project had to run round the clock. The local telco service provider had no connectivity, yet plant activity had to be monitored from the TAPP township, 20 km from the site, and from the Mumbai office, 250 km from the site, and certain locations within the site had no wired connectivity. We provided a Cisco remote access solution with secure login names and passwords, and network access limited by those credentials. Besides deploying Wi-Fi to connect various temporary office set-ups, Insight created secure internet access for the entire plant with a mix of Cisco PIX and WatchGuard UTM security. We laid more than 20 km of OFC, providing more than 30 segments on campus, and more than 40 km of CAT6 with 350+ networking points.
04 · In order of priority
The result
Insight systematically solved all the major problems of the project in order of priority.